The report includes information such as the job and delivery number, the customer name and address, the rectification order date, the required date, the completed date, any rectification comments, labour costs and material costs. A summary for each selected rectification code details the labour and material costs with a total for all selected rectification codes is printed at the end of the report. To report on the status of the rectification orders in the system perform the following: 1. From the  ProStix Main Menu  select  'Production Scheduling'  then  'Management   Reports ' then  'Rectification Analysis' . 2. The next screen displays the ranges to include in the report. Refer to the 'Rectification Analysis' collapsible link for a screenshot and an explanation of these options:     3. You are prompted with your printing/viewing options.