---
title: "EPC Price Change Load"
canonical: "https://kb.myframeworks.com.au/space/FRAM/28391552/EPC%20Price%20Change%20Load"
format: markdown
---
# Overview

The **EPC Price Change Load** task looks for price changes in a specified suppliers EPC file and loads the price changes into future pricing. This allows for the creation of smaller price change files which enables label printing and price changes to be applied a lot quicker.

The **EPC Price Change Load **task will:

1. Identify the products in the product file that meet the specified product group and/or primary locations defined on the report criteria tab.
2. Find a matching record in the specified suppliers EPC file.
3. Run or follow the existing cost/sell price change rules that exist in the update and load the price change into the system for the specified products.

# Running the EPC Price Change Load

To run the **EPC Price Change Load** task, perform the following:

> Macro (rw-ui-steps-macro)
> 
> > Macro (rw-step)
> 
> Click **Frameworks **then navigate to **Inventory > EPC Price Change Load **from the navigation tree.
> 
> > Macro (rw-step)
> 
> On the **Report Criteria** tab you can define the following:
> 
> - **Product Group: **If required, enter the product group for the products you want to apply the price changes to.
> - **Location: **If required, enter the location for the products you want to apply the price changes to.
> - **EPC Supplier: **Select the supplier for EPC record you want to apply the price changes to. This is REQUIRED
> - **Update Cost Price: **Tick to update the cost price for the specified products from the matched suppliers EPC file.
> - **Use EPC Sell Price: **Tick to use the EPC sell price from the matched suppliers EPC file.
> - **Price Change Effective Date: **Select the date the future price changes will be applied. This will default to tomorrow date and today's
> 
> ![image](media://dd9485bf-efdb-414e-b85e-5336ca077b7d)
> 
>  
> 
> > Macro (rw-step)
> 
> <span style="color: #333333">Go to the </span>**Schedule**<span style="color: #333333"> tab to schedule the task as required and then click </span>**Submit **<span style="color: #333333">to run the task.</span>
> 
> > ℹ️ If there are a large number of changes, we recommend running this task after business hours to reduce the load on your system.
> 
> > ✅ Refer to [Scheduled Task - Scheduling and Output ](https://sterlandsupport.atlassian.net/wiki/spaces/FRAM/pages/28402256)for more information.
> 
> > Macro (rw-step)
> 
> <span style="color: #333333">If you run the task immediately, the </span>**Output **<span style="color: #333333">tab displays the results of the completed task, and you can click on the reports generated. If run later, the </span>[Task Scheduler Queue](https://sterlandsupport.atlassian.net/wiki/spaces/FRAM/pages/28405088/Scheduler+Administration#%5BinlineExtension%5DTask-Scheduler-Queue)<span style="color: #333333"> contains the output.</span>

# Additional Information

> ✅ Refer to the [EPC Dashboard ](https://sterlandsupport.atlassian.net/wiki/spaces/FRAM/pages/28409332)for additional information.