---
title: "How to Import a file into Production Componentry"
canonical: "https://kb.myframeworks.com.au/space/CO/30507034/How%20to%20Import%20a%20file%20into%20Production%20Componentry"
format: markdown
---
| **Task** |
| --- |
| From the hamburger menu go to **Production Scheduling** - **Transaction Processing** and open **Process Management.** |
| Locate the Job you wish to import the Mitek file componentry. |
| Click the "Production" button and from drop down arrow > Macro (inline-media-image)

select the required import format from the 'Import From:' field.<br>You can import the following file types:<br>Basic .csv - template available to download here:<br>Mitek file - Only the following sections of the Mitek file are needed/imported;   
- TrussMember   
- PanelMember   
- PlateSizes   
- Ancillaries<br>Pyrda File<br>Multinail file. |
| Click the "Import" button to invoke the **File Import **popup box. Locate the desired Mitek file you wish to import and click "Upload". |
| Ensure the correct details have imported into the **Componentry** section of the Production Details screen.<br>Only the following fields should be imported from the Mitek file: Truss Member, Panel Member, Plate Sizes & Ancillaries.<br>> ⚠️ When importing componentry and setting the labour and overheads values;  
> ⚠️ If transaction is a quote, the plant cost multiplier comes from the qty against the estimating task.  
> ⚠️ If transaction is an order, the plant cost multiplier comes from the qty against the manufacturing task. |
| Click "Save". |

For further detailed information, refer to: [SKB](https://sterlandsupport.atlassian.net/wiki/pages/createpage.action?spaceKey=SKBHP&title=SKB).